โครงการศูนย์กีฬาสุดอินเทรนด์แห่งซาอุดีอาระเบียของ Midong Play: บันทึกฉบับสมบูรณ์
As a leading domestic manufacturer of trendy sports complexes and amusement equipment, Midong Play recently completed the successful delivery of a trendy sports complex project in Riyadh, the capital of Saudi Arabia. This project, from design and production to construction, strictly adhered to international safety standards, showcasing “Made in China” quality with professional craftsmanship. It has created a high-quality sports space for the Middle East that combines fun and safety.
Standardized Construction: A Full Process Breakdown
Phase One: Meticulous Material Selection and Scientific Laying
As a professional amusement equipment factory, Midong Play understands the importance of foundational engineering. After the project commenced, the first batch of buffer sponge mats arriving on-site were all made from EU CE certified materials. Each mat underwent a rigorous three-step quality check: “unpacking quality inspection – manual fluffing – rebound testing.” The construction team, working in 48℃ high-temperature conditions, spent 5 days completing the basic laying of the 1200m² area. They utilized a layered cross-laying method, ensuring the joint error between mats was ≤3mm, laying a precise foundation for subsequent work.
Phase Two: Modular Installation of Core Equipment
- Sponge Ball Pit System: As a core area of the trendy sports complex, the main structure of the ball pit used galvanized steel. On-site, laser positioning technology was employed for precise assembly. 200,000 environmentally friendly EPP balls were filled in batches, with each batch undergoing pressure testing to ensure their cushioning performance met the ASTM F1918 standard.
- Professional Sports Flooring Installation: Given Saudi Arabia’s high temperatures, weather-resistant PVC flooring was selected. The construction team employed a “pre-laying – hot-melting – rolling” three-step process. A red infrared calibration instrument was specifically used to ensure the flatness error of the 2000m² flooring joints was ≤0.5mm.
- Three-Dimensional Protection System Construction: The high-altitude anti-fall nets were made from high-strength nylon woven mesh, with each anchor point subjected to a 300kg tensile test. All steel structure edges were fully covered with 15mm thick high-density soft padding, verified by a third-party testing agency to have an impact absorption rate of up to 65%.
Phase Three: Deepening Safety Protection Engineering
158 metal joints throughout the entire complex underwent secondary protection treatment, utilizing a food-grade silicone edging process. This ensured both safety and avoided the bulky feel of traditional soft padding. All protective components were designed with reserved inspection ports for convenient future maintenance.
Project Achievements and Industry Recognition
During the project acceptance phase, the Saudi client specially invited a team of experts from Germany’s TÜV to participate in the inspection. After rigorous testing, all indicators of the venue exceeded GCC certification requirements, with the critical structural redundancy factor reaching 2.5 times. The complex was awarded the first “Family Entertainment Facility Safety Excellence Certificate” in the Middle East.
During construction, Midong Play’s innovative “segmented pre-assembly” process significantly improved efficiency, shortening the construction period by 20% compared to traditional methods. This case has been selected as a reference example in the “Middle East Entertainment Facility Construction Standards.”
Client Testimonial
“From initial design blueprints to construction details, Midong Play demonstrated the highest level of professionalism as a trendy sports complex manufacturer,” stated the project’s general manager. “This venue has not only become a new landmark for family entertainment locally but has also redefined safety standards for sports venues in the Middle East.”
Inquire now to get an exclusive county market development plan! Let your indoor children’s park become a new cultural and tourism landmark in the area!
▶ Why Choose Midong Play?
- 16 years of industry experience, serving over 1200 parent-child space projects globally.
- Provides full-chain solutions from “theme planning – equipment R&D – space operation.”
- 7×24 hour after-sales response, continuously empowering commercial spaces.
▶ Client Testimonial “Midong’s design not only makes children happy but also increases the average transaction value by 30% through scientific circulation planning!” — Operations Director of Mushroom Cub Sports Complex
▶ Scan the QR code to get your exclusive solution now!